SAP Knowledge Base Article - Public

2798716 - How to set-up Multiple Executions per day feature in Integration center for outbound integration - SAP SuccessFactors Integration Center

Symptom

  • Integration center now supports multiple executions per day from 1905 release onwards
  • You can schedule the outbound integrations to execute multiple times per day
  • This feature is only available for outbound integrations

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.

Environment

SAP SuccessFactors HCM Suite - Integration Center

Resolution

Step 1:

Enable "Time-Based Filters"(Guide Link) in the "Filter and Sort"tab (Prerequisite)

Timebased.JPG

Note: without enabling the time Based filter, the option for multiple executions per day cannot be chosen/selected from the drop down

Error_popup.JPG

Step 2:

Goto "Scheduling" tab and choose "Multiple Executions Per Day"

Scheduling.JPG

Note: Selecting this option allows you to schedule an outbound integration every hour based on the time and date selected. You can schedule a maximum of 5 such integrations with a frequency of minimum 3 times per day up to a maximum of 6 times per day. An error occurs if you have reached a maximum limit of 5 integrations with this scheduling type.

See Also

Integration Center guide scheduling topic

Integration Center workbook

Keywords

how to run integrations in integration center more than once per day? , multiple runs per day , integration center multiple runs, modified since query mode , KBA , LOD-SF-INT-INC , Integration Center , LOD-SF-INT , SF Integrations - EC Payroll, Boomi/ HCI, API , Product Enhancement

Product

SAP SuccessFactors HCM Suite all versions