2570408 - System Trigger a Warning Message When MRP Run is Ran

SAP Knowledge Base Article - Public

2570408 - System Trigger a Warning Message When MRP Run is Ran

Symptom

When a MRP Run is performed for product XYZ, a warning message appears.

Product XYZ in planning area ABC planned with warnings. See interactive Planning Log for more details.

Reproducing the Issue

  1. Go to Supply Planning Work Center.
  2. Go to Products View.
  3. Search for Product XYZ(XYZ indicates Product id)
  4. Select Go.
  5. Select Open.
  6. Select Run Planning and select Multilevel BoM.

A warning message appears.

Product XYZ in planning area ABC planned with warnings. See interactive Planning Log for more details.

Cause

This warning message indicates that the product XYZ was planned, but that the planning run was not able to cover all demands on time. Dates have been violated.

Resolution

This is a generic message and as of now this is working as designed.
You can see more details under exceptions tab, by choosing the line item of product planning details.

Keywords

MRP Run , KBA , product xyz in planning area abc planned , see interactive planning log for more de , AP-SDM , Supply and Demand Matching , Problem

Product

SAP BUSINESS BYDESIGN 1802 ; SAP Business ByDesign 1711