SAP Knowledge Base Article - Preview

2630923 - SUM ABAP : MAIN_NEWBAS/TABIM_UPG consumes 100% memory and slows down

Symptom

During a system update using Software Update Manager (SUM) or SAPup tool in the downtime phase MAIN_NEWBAS/TABIM_UPG 100% memory consumption is experienced, especially when the language packages get imported. The R3trans processes are showing the trend of every growing memory consumption.

 

Example:

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
MAIN IMPORT ERRORS and RETURN CODE in SAPILHU618GAERP608F2.Z02
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
4 ETW000 E071-LOCKFLAGs 000998 - 001025 updated ('2', 28 entries).
4 ETW690 COMMIT "3928" "14688168"
4 ETW675 end import of "LANGTABURSRD_ATTR_GROUPT".
4 ETW675 end import of "LANGTABUT7RO17T".
4 ETW000   0 d /  35 i / 157 u / 2868 =  93% ucf FPLAYOUTT
1AETP000 R3trans received signal 9 from operating system.
1 ETP111 exit code           : "13"

Read more...

Environment

Based on NetWeaver release

Product

SAP ERP 6.0 ; SAP NetWeaver 2004 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0

Keywords

EHP8, SUM 2.0, r3transoptions, table cache size, tcs,FPLAYOUTT , KBA , BC-CTS-TLS , Transport Tools , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.