SAP Knowledge Base Article - Preview

2583125 - Kernel error:Connection to partner timed

Symptom

For Index job of enterprise search (Full Indexing job starts with ESH* / Real Time Indexing job starts with ESH_FU_DEMON_*), following error information is displayed:

  • TREX call terminated with technical error
  • Remote communication failure with partner http://hostname:indexserver port number/asxml/multiIndexCellTable/HTTP Status 402: Kernel error:Connection to partner timed
  • An exception was raised

Read more...

Environment

  • SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5

Product

SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5

Keywords

SM21, ICM timeout, ICM_HTTP_TIMEOUT , KBA , BC-EIM-ESH , NetWeaver Enterprise Search , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.