2433741 - Step "Update content" > "Active Content" the date is not shown correctly, it is displayed as 00 0000 | SAP Knowledge Base Article

SAP Knowledge Base Article - Preview

2433741 - Step "Update content" > "Active Content" the date is not shown correctly, it is displayed as 00 0000

Symptom

"Active Content" date is not shown correctly it is displayed as 00 0000 in Interfaces and Connections "Content Update" or other scenarios  such as PI Monitoring or System Monitoring.

Content Update.jpg


Read "Active Content" the date is not shown correctly, it is displayed as 00 0000">more...

Environment

  • SAP Solution Manager 7.2

Product

SAP Solution Manager 7.2

Keywords

#SOLMAN, Monitoring content, Technical Monitoring, Timestamp, application operations, SAP Generated Content at 00 0000 , KBA , SV-SMG-MON-ALR-CFG , Alert / Metric Configuration , SV-SMG-RCD , Rapid Content Delivery , SV-SMG-MON-IPO-IC , Interface Monitoring , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.