SAP Knowledge Base Article - Preview

2351612 - PAK: Copy Function doesn't copy all periods or CL_RSPLS_HDB_SWITCH dump

Symptom

You are running the BW-IP standard copy function and it is not copying all periods it should do. Running the same function without using PAK it copies everything.

or

While running a planning function you get the UNCAUGHT_EXCEPTION CL_RSPLS_HDB_SWITCH dump for 0DATE time characteristic

 d1.png

d2.png


Read more...

Environment

  • SAP BW/4HANA 1.0
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5

Product

SAP BW/4HANA 1.0 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5

Keywords

PAK, Sequence, BW-IP, Time, Copy, RSRHIERARCHYVIRT, UNCAUGHT_EXCEPTION,  CL_RSPLS_HDB_SWITCH, CL_RSR_FIPT_VAL2SID_PREFETCH, CX_RSR_PROPAGATE_X, 0DATE , KBA , BW-PLA-IP , Integrated Planning , EPM-BPC-BW4-PLA , BPC/4 - Planning Enginee , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.