SAP Knowledge Base Article - Preview

2263216 - Invalid suspend deferred growth - SAP IQ

Symptom

SAP IQ coordinator node down abnormally. There were no information in iqmsg file and no stack trace file. There was just an error information in srvlog file.

*** ERROR *** Assertion failed: 102012 (16.0.0.809) invalid suspend deferred growth

There were lots of disconnection of dbbackup operation in srvlog file before the error generated.

I. 12/27 11:27:14. Connection terminated abnormally
I. 12/27 11:27:14. Disconnected TCPIP client's AppInfo: IP=172.16.25.58;HOST=sybaseiqc1h9;OSUSER=root;OS='Linux 3.0.101-0.47.50-default #1 SMP Thu Mar 5 21:07:58 UTC 2015 (7d96a60) x';EXE=/opt/sybase/IQ-16_0/bin64/dbbackup;PID=0x26c2b;THREAD=0x7f01e9db1720;VERSION=16.0.0.809;API=DBLIB;TIMEZONEADJUSTMENT=480


Read more...

Environment

  • SAP IQ 16 SP08 PL38
  • All unix platform

Product

SAP IQ 16.0

Keywords

Assertion failed, 102012 , KBA , BC-SYB-IQ , Sybase IQ , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.