SAP Knowledge Base Article - Preview

2240791 - Application Installation fails with "RSE4008: Communication error [SYS995 I/O operation has been aborted...]" in SAP Relay Server logs -Afaria

Symptom

  • Upon pushing an application to a device via Afaria, the application installation fails, and the following logs are written to the Relay Server log:
    <PackageFarmID> <serverID> RSE4008: Communication error [SYS995: The I/O operation has been aborted because of either a thread exit or an application request...] occurred while writing response to client of backend server 'serverID' in backend farm 'PackageFarmID' when flushing
    <PackageFarmID> <serverID> RSW103: The backend connection was terminated before the entire content length response body was received. Remaining 1185837 of 5832851 bytes
    <PackageFarmID> <serverID> Signal OE to disconnect non-persistent backend connection
    AND/OR
  • Relay Server crashes shortly after Restart
    AND/OR
  • Content of rs.conig file gets flushed/removed after the crash

Read more...

Environment

  • SAP Afaria 7
  • SAP Relay Server 12 and above

Product

SAP Afaria 7.0

Keywords

RSE4008, RSW103, non-persistent backend connection, relay server, crash, rs.config removed, flushed, SYS995, I/O operation has been aborted , KBA , MOB-AFA , Afaria , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.