SAP Knowledge Base Article - Preview

2228491 - The Integrated Planning message's necessary information for Design Studio

Symptom

  • You run into an Integrated Planning issue in Design Studio and would like to create a message under component BW-PLA-IP.
  • Often the first reply in a message is always requesting the same data or actions.

Read more...

Environment

  • SAP BW/4HANA 1.0
  • SAP BusinessObjects Design Studio 1.4 
  • SAP BusinessObjects Design Studio 1.5
  • SAP BusinessObjects Design Studio 1.6
  • SAP NetWeaver SAP NetWeaver 7.0
  • SAP NetWeaver 7.3
  • SAP NetWeaver 7.4
  • SAP NetWeaver 7.5
  • SAP enhancement package 1 for SAP NetWeaver 7.0
  • SAP enhancement package 1 for SAP NetWeaver 7.3
  • SAP enhancement package 2 for SAP NetWeaver 7.0
  • SAP enhancement package 3 for SAP NetWeaver 7.0

Product

SAP BW/4HANA 1.0 ; SAP BusinessObjects Design Studio 1.4 ; SAP BusinessObjects Design Studio 1.5 ; SAP BusinessObjects Design Studio 1.6 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0

Keywords

required information, Planning, Design Studio, prerequisites, check list , KBA , BW-PLA-IP , Integrated Planning , BI-RA-AD , Design Studio , EPM-BPC-BW4-PLA , BPC/4 - Planning Enginee , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.