SAP Knowledge Base Article - Preview

3112906 - SUM 2.0 SP12: Phase PREP_PRE_CHECK/SPAMCHK_INI fails with signal 6

Symptom

  • Running an upgrade using SUM 2.0 SP12, PREP_PRE_CHECK/SPAMCHK_INI fails with signal 6
  • Similar information is found in C-STAK (.../SUM/abap/tmp/dev_SAPup:)
    • ------------------ C-STACK ----------------------
      SAPup_real[S](LinStackBacktrace+0xa9)
      SAPup_real[S](LinStack+0x4d)
      SAPup_real[S](CTrcStack2+0x4b)
      SAPup_real[S](abortHandler(void*, int) [clone .part.8]+0x187)
      <signal handler called> 
      libc.so.6[S](__GI_raise+0x10b)
      libc.so.6[S](__GI_abort+0x175)
      SAPup_real[S](ul_sprintf(char16_t*, unsigned long, char16_t const*, ...)+0x89)
      SAPup_real[S](SAPupPhaseSPAMCHK::getRequestedSpamVersionFromStack() const+0xed)
  • Download directory is longer than 41 characters


Read more...

Environment

SAP NetWeaver, SAP S/4HANA

Product

SAP NetWeaver all versions ; SAP S/4HANA all versions

Keywords

KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.