SAP Knowledge Base Article - Preview

3033810 - GC overhead limit exceeded: SAP BC issue

Symptom

SAP Business Connector (SAP BC) fails to start (or is unstable) and the below error is recorded in the trace files (../sapbc48/server/logs*):
*********************************
Exception in thread "SAP Business Connector Server"
java.lang.OutOfMemoryError: GC overhead limit exceeded
*********************************

 


Read more...

Environment

  • SAP Business Connector
  • Release Independent

Product

SAP Business Connector all versions ; SAP ERP 6.0

Keywords

sap business connector memory, SAP BC developer, shuts down, 4.8, 4.7 <Developer>/bin/integrator.bat integrator.sh Caching clear cache server.cnf sapbc48\Server\config server.cnf watt.net.ssl.server.strongcipheronly 1240081 initialization configuration  ../sapbc48/server/config. set ACL notepad restore file system backup , KBA , BC-MID-BUS , Business Connector , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.