Symptom
- SLT jobs stuck in scheduled
- Master Job not reset at Midnight
- Table stuck in Initial Load
- R64 > CPI-C function: CMINIT(SAP)
- Configuration is aborted
- MT_ID is aborted
- Tables not replicating
- No free batch work processes available
- Job /1LT/IUC_LOAD_MT_00X: Job has been waiting to start for more than 3 minutes
- Error when opening an RFC connection
- SLT job stuck after RFC connection issue
- SLT jobs not working after midnight reset
- Load jobs not working after RFC connection issue
- Q0I Operating system call connect failed (error no. 111 )
- R49 Communication error, CPIC return code 017, SAP return code 236
- Communication error occurred by calling function module in sender system
- RFC communication error "Error when opening an RFC connection (CPIC-CALL: ' (RFC destination <RFC Connection>)"
Read more...
Environment
SAP Landscape Transformation replication server
Product
SAP Landscape Transformation replication server all versions
Keywords
DMIS 2011 SP14, /1LT/IUC_REP_MSTR, /1LT/IUC_HEALTH_C, /1LT/IUC_REP_CNTR, /1LT/IUC_LOAD_MT, /1LT/IUC_DEF_COB, /1LT/IUC_CALC_ACP, Initial Load, stuck, scheduled , KBA , HAN-DP-LTR , Use CA-LT-SLT instead , CA-LT-SLT , SAP Landscape Transformation Replication Server , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP ONE Support launchpad (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.